References - order by products

USA, El Paso, Texas, Sierra Providence East Medical Center

Object
Sierra Providence East Medical Center, El Paso, Texas 
Fields of application
Moisture Vapor Reduction System under cementitious underlayments
Self-leveling underlayment on porous and non-porous substrates
Description
A five story addition was being built next to the existing Sierra Providence East Medical Center in El Paso, TX. All areas specified with heat welded sheet vinyl were also specified to receive KOSTER VAP I® 2000 FS. Flooring Solutions shot blasted 32,000 sf to a CSP3 and installed KOSTER VAP I® 2000 FS, KOSTER VAP I® 06 primer and over 800 bags of KOSTER SL underlayment.  
Product applied
KOSTER SL
KOSTER VAP I 06 Primer
KOSTER VAP I 2000 FS
General Contractor / Applicator
General Contractor: Robins & Morton Construction Applicator: Flooring Solutions 
Select product:

 

 

Back

Top
Albania Bosnia and Herzegovina Brasil Bulgaria China Colombia Croatia Czech Republic Denmark Finland Germany Greece Iraq Italy Japan Kazakhstan Kuwait Latvia Lebanon Macedonia Mexico Netherlands New Zealand Panama Poland Portugal Romania Serbia Slovakia Slovenia South Africa Spain Turkey Ukraine United Kingdom United States of America